SYSTEM INSTALLATION

There are general recommendations to help the client and the installer choose the right materials, equipment, and installation methods that will help ensure that the system will provide many years of reliable service. These recommendations can be used to evaluate pre-engineered system designs and compare system features from one supplier to another.

Installation Services Provided by CMR Solar Energy Integrators

CONSTRUCTION SUPPORT REVIEW

Review and investigate Construction Support, identify potential hurdles & recommend solutions:

  • Supply & service contract terms & conditions.
  • Key subcontractors.
  • Installation schedule. //Top..

OVERALL RISK ASSESSMENT

Summarize project risk in terms of potential impact on:

  • Construction schedule.
  • System performance.
  • Long term reliability. //Top..

SITE INSPECTION

Visit site to:

  • Verify as-built installation.
  • Evaluate workmanship.
  • Verify permit compliance.
  • Verify schedule conformance.
  • Perform or witness sub system testing.
  • Develop punch list and check status as necessary. //Top..

SYSTEM TEST

Witness or review data set to:

  • Verify minimum period of continued operation.
  • Assess actual vs. predicted output.
  • Other contractual measure of acceptable performance. //Top..

FINAL COMPLETION

Verify the completion accuracy of all items to be declared listed on the Final Completion Notice, such as:

  • System ready for full, unattended commercial operation.
  • System passed inspections with AHJ.
  • Utility interconnection installation evaluation complete.
  • System tests passed successfully. //Top..

PERFORMANCE EVALUATION

Complete or spot evaluation of array, tracker, inverter through the use of:

  • Spot voltage and current measurements.
  • IV curves.
  • As-installed array and system ratings.
  • Independent performance monitoring. //Top..

Installing a PV System

  • Ensure the roof area or other installation site is capable of handling the desired system size.
  • If roof mounted, verify that the roof is capable of handling additional weight of PV system. Augment roof structure as necessary.
  • Properly seal any roof penetrations with roofing industry approved sealing methods.
  • Install equipment according to manufacturers specifications, using installation requirements and procedures from the manufacturers' specifications.
  • Properly ground the system parts to reduce the threat of shock hazards and induced surges.
  • Check for proper PV system operation by following the checkout procedures on the PV System. //Top..

Installation Checklist.

  • Ensure the design meets local utility interconnection requirements
  • Have final inspections completed by the Authority Having Jurisdiction (AHJ) and the utility (if required). //Top..
//Top..

RETURN TO TOP OF PAGE
CMR Integrators - Solar Energy
Clean Mainstream Renewable
San Ramon, CA 94583
Business: (925)917-1315 - Fax: (877)334-0711 - www.CMRSolar.com

Copyright 2010 - All rights reserved | Website designed by V2D - Ronald Robles | Admin Login